Complete Guide: Full Renovation in Luxembourg (2026)

Everything you need to know for a successful complete renovation: steps, trades, price per m², timelines, and available grants in Luxembourg.

tack.lu

Author

24 February 2026
12 min read
Complete Guide: Full Renovation in Luxembourg (2026)

A complete renovation entirely transforms your property: plumbing, electrical, heating, insulation, joinery, floors, walls, kitchen, bathroom… It’s an ambitious project that requires meticulous preparation and professional support.

What is a Complete Renovation?

A complete renovation (or “whole-home renovation”) covers all technical and finishing work in a home:

  • Demolition of existing elements (partitions, coverings)
  • Structural work if necessary (structural modifications)
  • Complete plumbing and sanitary installations
  • Electrical system brought up to standard
  • Heating and ventilation
  • Thermal and acoustic insulation
  • Interior and sometimes exterior joinery
  • Floor and wall coverings
  • Fully equipped kitchen and bathroom(s)

The 10 Steps of a Complete Renovation

1. Project Definition (2-4 weeks)

List your needs, your wishes, your budget. Visit showrooms, collect inspiration.

2. Finding Professionals (2-3 weeks)

On tack.lu, describe your project and receive up to 3 quotes from verified companies.

3. Studies and Detailed Quotes (2-4 weeks)

The companies visit, take measurements, and prepare itemized quotes line by line.

4. Permits (0-3 months)

If you modify the structure or the facades, a building permit may be required.

5. Demolition and Preparation (1-2 weeks)

Removal of old fixtures, demolition of partitions, rubble disposal.

6. Structural Work (2-4 weeks)

Modifying partitions, creating openings, reinforcement if necessary.

7. Technical Second Fix (3-6 weeks)

Running the networks: plumbing, electrical, heating, mechanical ventilation.

8. Insulation and Partitioning (2-3 weeks)

Installation of thermal and acoustic insulation, assembly of partitions and suspended ceilings.

9. Coverings and Finishes (3-4 weeks)

Tiling, parquet, painting, wallpaper, wall tiles.

10. Fittings and Handover (1-2 weeks)

Kitchen and bathroom installation, final adjustments, cleaning, handover.

Trades and Order of Intervention

OrderTradeAverage Duration
1Mason (structural work)2-4 weeks
2Plumber (networks)1-2 weeks
3Electrician (wiring)1-2 weeks
4Heating engineer1 week
5Drywaller / Plasterer2-3 weeks
6Tiler1-2 weeks
7Carpenter / Joiner1-2 weeks
8Painter1-2 weeks
9Kitchen / Bathroom fitter1-2 weeks

The order is crucial: the plumber must run their pipes BEFORE the drywaller. That’s why a single point of contact is recommended.

Why choose a single point of contact →

Average Price per m² in Luxembourg (2026)

Renovation TypePrice/m²Example 80m²
Light renovation€400-700€32,000-56,000
Medium renovation€700-1,000€56,000-80,000
Complete renovation€1,000-1,300€80,000-104,000
Premium renovation€1,300-1,800€104,000-144,000

These prices include all trades and standard finishes.

Realistic Duration of a Complete Renovation

SurfaceEstimated Duration
Studio 30m²6-10 weeks
Apartment 60m²10-14 weeks
Apartment 100m²14-18 weeks
House 150m²5-8 months
House 200m²+6-12 months

Add 2-4 months if a building permit is required.

3% VAT: Conditions and Savings

In Luxembourg, you benefit from the super-reduced 3% VAT if:

  • The property is more than 10 years old
  • It’s your primary residence
  • You are the owner-occupier

Savings on €80,000 of works:

  • 17% VAT: €13,600
  • 3% VAT: €2,400
  • Savings: €11,200

Klimabonus Grants 2026

Energy renovation works benefit from substantial grants:

WorksMaximum Grant
Roof insulation€50/m²
Wall insulation€60/m²
Heat pumpup to €12,000
Triple-glazed windows€50/m²
Mechanical ventilation (VMC)up to €3,000

Complete Klimabonus 2026 guide →

How to Choose Your Company?

What to check:

  • ✅ Registration with the Chamber of Trades (Chambre des Métiers)
  • ✅ Valid ten-year liability insurance
  • ✅ Verifiable references
  • ✅ Detailed, itemized quote
  • ✅ Realistic schedule

What to avoid:

  • ❌ Quote that is too vague or lump-sum
  • ❌ No on-site visit
  • ❌ Abnormally low price
  • ❌ Deposit request > 30%
  • ❌ No written contract

Find a company for a complete renovation →

FAQ

Can you live in the home during the works?

For a complete renovation, it’s very difficult. Water and electricity are often cut off for several weeks. Plan for temporary accommodation.

Do you need an architect?

Mandatory if you modify the building’s structure (load-bearing walls, facade). Recommended for complex projects even when not legally required.

How much should you set aside for contingencies?

10 to 15% of the total budget. In a renovation, hidden problems are often discovered (damp, outdated wiring, etc.).

Request a complete renovation quote →